⭐ TL;DR
Coimbatore’s most significant traffic project is finally moving forward! After five years of waiting, the government has approved two new down-ramps for the Gandhipuram Flyover Upgrade. These ramps will be built at 100 Feet Road – Park Gate Side and Bharathiyar Road – Sathyamangalam Road Junction, easing heavy traffic near Gandhipuram, Sathy Road, and Bharathiyar Road. Construction is set to begin within the next 3 months.
📰 Major Upgrade for Gandhipuram Flyover: Coimbatore to Get Two New Down-Ramps After 5 Years of Delay
The long-awaited Gandhipuram Flyover Upgrade project in Coimbatore has finally received official approval, bringing a huge sigh of relief to thousands of daily commuters. For more than five years, residents, office-goers, and traders have been requesting additional connectivity from the first-level flyover. Now, the government has sanctioned the construction of two essential down-ramps that will significantly reduce congestion in the city’s busiest traffic zone.
As part of this major Gandhipuram Flyover Upgrade, the new down-ramps will connect:
✔ 100 Feet Road – Park Gate Side
✔ Bharathiyar Road – Sathyamangalam Road Junction
According to officials, around 850 sq. meters of land will be acquired for smooth execution of the project. With daily traffic volume increasing year after year, these new ramps are expected to drastically improve vehicle movement, reduce bottlenecks, and enhance safety.
Coimbatore residents have long expressed concerns about heavy congestion near the first-level flyover, especially during peak hours. This upgrade comes as a promising turning point for road users, aligning with ongoing infrastructure improvements across the city.
🛣️ Why the Gandhipuram Flyover Upgrade Matters
Gandhipuram stands at the heart of Coimbatore’s transport network. Almost every major route—from Sathy Road to Bharathiyar Road—passes through this area, making it prone to delays and gridlocks. The lack of proper descent points from the first-level flyover forced vehicles to travel longer distances before finding an exit.
With the new down-ramps:
- Emergency vehicles will benefit from faster access
- Daily commuters will experience smoother travel
- Commercial traffic will move more efficiently
- Transport buses and autos will have easier route options
- Pollution and fuel usage are expected to reduce
For readers interested in Coimbatore updates, you can browse more city news at:
👉 Coimbatore News – Todays Coimbatore
🏗️ Where Will the New Ramps Be Constructed?
📍 1. 100 Feet Road – Towards Park Gate Side
A heavily used zone, connecting Gandhipuram to various commercial stretches.
📍 2. Bharathiyar Road – Sathyamanagalam Road Junction
One of Coimbatore’s most crowded intersections, linking several educational institutions, hospitals, and business centres.
These points were finalized after extensive studies on traffic flow and future mobility expansion.
⏳ Construction Timeline & Land Acquisition
According to official sources, construction work for the Gandhipuram Flyover Upgrade is expected to begin within the next three months. The ramp structure will be developed using modern engineering methods to ensure minimal disruption during the building phase.
Land measurement and acquisition procedures are already progressing, and the District Administration is coordinating with property owners for smooth completion.
🚦 How This Upgrade Will Impact Coimbatore Traffic
Below are some positive changes commuters can expect:
✔ Reduced Traffic Congestion
Vehicles can exit the flyover earlier without traveling extra kilometres.
✔ Improved Safety
Smoother traffic means fewer accidents during peak hours.
✔ Faster Travel Time
Commuters traveling between Gandhipuram, 100 Feet Road, and Sathy Road will save significant time.
✔ Better Traffic Distribution
The load will be shared between multiple exit points instead of a single overburdened junction.
For insights about urban infrastructure and development, explore:
🔗 Urban Transport Insights – The Hindu
🔗 Road & Infrastructure News – Times of India
(High-authority external links)
🏙️ Gandhipuram: A Crucial Transport Hub That Needed This Upgrade
Gandhipuram isn’t just a junction—it’s the pulse of Coimbatore’s movement. With thousands of commuters coming from Peelamedu, Sathy Road, Town Hall, and PN Palayam, traffic load has consistently remained high.
The Gandhipuram Flyover Upgrade will now serve as a structural relief, especially for:
- College students
- IT employees
- Public and private transport vehicles
- Automobile showrooms
- Hospitals nearby
This project is expected to enhance urban mobility and support Coimbatore’s rapid growth.
🏗️ What Happens Next?
Residents can expect the following next steps:
- Completion of land acquisition
- Detailed engineering design approval
- Traffic diversion planning (temporary)
- Start of construction
- Public safety measures during project execution
- Public announcements will follow as each stage progresses.
📌 Conclusion
The approval for the Gandhipuram Flyover Upgrade marks a major milestone in Coimbatore’s infrastructure development. These new down-ramps are not just engineering projects – they promise real relief for everyday commuters who have struggled with delays for years.
As Coimbatore continues to expand, this upgrade strengthens the city’s commitment to improved mobility, smarter road networks, and better urban living.
Stay tuned for more updates on Coimbatore’s major infrastructure developments through:
👉 Todays Coimbatore – Coimbatore News Section